Name | Description | Client | Team | Date | Surface | Budget |
---|---|---|---|---|---|---|
Dames BlanchesView project | new garden city of 200 housing units with community amenities | SLRB - BGHM | Atelier Kempe Thill Ney Studie10 |
2023 | ||
Elia Service CenterView project | The ELIA Service Center in Kruisem consists of a passive office building (1.155 m²), a low-energy warehouse and workshop (5.083 m²), and a waste collection area with covered outdoor storage (4.001 m²). The landscape design includes 20% unpaved surface for water infiltration, with additional permeable paving and green zones, integrating tree planting and a small wadi near the buffer basins. The project aims for CO2 neutrality, with energy-efficient building systems, water infiltration measures, and modular, prefabricated construction to minimize material waste and environmental footprint. Architecturally, the building is composed of two rectangular volumes connected at a slight angle, maximizing buildable area while ensuring sufficient manoeuvring space around the workshop. The warehouse and workshop are constructed from prefabricated concrete elements, clad in insulated steel sandwich panels. The office is composed of modular, prefabricated wood elements, enhancing flexibility and sustainability, while providing thermal efficiency and a reduced carbon footprint. The facades of the office are clad in thermally treated wood using the ‘Shou Sugi Ban’ technique, giving the wood enhanced fire resistance and durability, complemented by gold tinted aluminium window frames. |
Elia | Arcadis Arcadis |
2023 - 2025 | 6.240 m² | 11.500.000 |
The NestView project | Competition: Construction of a benchmark 'Next-Gen' office building, integrating biophilic design, wood construction, occupant well-being, energy neutrality, and a minimal ecological footprint. | Eaglestone Luxemburg | Ney Wow Greisch |
2022 - 2023 | 8.700 above ground, 3.100 underground | n/c |
Stumper | Competition: Construction of an office building with a (hybrid) wood structure of approximately 4,000 m² above ground. | IKO | 2021 | 3.930 sqm above ground, 1.360 sqm underground | n/c | |
Van OverbekeView project | Competition: Housing and community facilities avenue Van Overbeke in Ganshoren | SLRB | Arcadis (structure) Arcadis (services) |
2020 | 17.985.817,98 | |
CCNView project | Redevelopment of the CCN site Quartier Nord, including urban planning, housing, offices, retail, public amenities and multimodal hub in Schaerbeek/St Josse | AG Real Estate and ATENOR | DDS+ Greisch TPF/Arcadis |
2019 - 2027 | 160 000 sqm above ground level, 40 000 sqm below ground level | n/c |
ArchiducsView project | Competition: Social, inter-generational and community housing and facilities in Watermael-Boitsfort | SLRB | CSDIngénieurs+ FTI |
2018 | 4198 m2 above ground level, 1888 m2 under ground level | n/c |
Casernes Leopold Namur | Construction of an urban block including offices, housing, retail, day-care center, community functions and landscaping avenues Bourgeois and Cauchy (work in progress) |
AG Real Estate | DDS+, 3E, EOLE BSolutions |
2018 - 2025 | 33 000 sqm above ground level and 14 000 sqm below ground level | 50.335.901 |
HD15 | Construction of a hotel avenue H. Debroux in Auderghem | IMMO SAMBRE sa | ATS CSD Alliance Engineering |
2018 - 2020 | 3 611 sqm above ground level and 1 318 sqm below ground level | 5.485.100 |
Hotel Bara | Construction of a hotel rue Bara in Anderlecht | MS sprl | CSD Alliance Engineering |
2018 - 2020 | 3 346 sqm above ground level and 3 496 sqm below ground level | 4.351.600 |
Maison Administrative de la Province de NamurView project | Competition: Urban planning and construction of The Ville de Namur's administrative headquarters, including offices, workshops, cafeteria and landscaping, rue Bodart in Namur | Province de Namur | Setesco Alliance |
2018 - 2019 | : 9.713 sqm above ground level, 781 sqm below ground level, 25.000 sqm landscaping | 18.496.511 |
Rempart des MoinesView project | Competition : Housing and community facilities rue du Rempart des Moines in Brussels | Le logement Bruxellois | BAS Détang Engineering |
2018 - 2019 | 45.608 sqm above ground level, 12.900 sqm below ground level, 5.300 sqm landscaping | 64.127.000 |
UNICITYView project | Construction of a mixed-use project rue de Hollerith in Luxembourg including offices, housing, retail and public plaza (work in progress) |
IKO REAL ESTATE / THOMAS&PIRON LUX | ICB BETIC |
2018 - 2024 | 13 995 sqm above ground level | n/c |
Chaussée d'Ixelles 63View project | Conversion and extension of an existing retail complex into housing, retail and offices chaussée d’Ixelles in Ixelles | Redevco Belgium | Setesco FTI Amart |
2017 - 2018 | 8 000 m2 above ground level and 4 500 m2 below ground level | 8 500 000 |
Orban | Complete renovation of a complex of three office buildings in the European quarter, rue d’Arlon and rue de la Science in Brussels | DEGI Science SA et DEGI Arlon | Arcadis Axxio |
2017 - 2022 | 19 056 sqm above ground level, 9 087 sqm under ground level, 2 460 sqm landscaping | n/c |
PachecoView project | Refurbishment of the Belgian Royal Mint (KMR) into a multifunctional hub including offices, co-living, retail and horeca, Pacheco Boulevard in Brussels | Fedimmo | Ney & Partners WOW Arcadis |
2017 - 2024 | 11.634 sqm above ground level, 4.724 sqm below ground level | 24.800.000 |
HD54View project | Heavy refurbishment of an office building on the avenue Hermann-Debroux in Auderghem | AXA investment managers – AXA Belgium | Pirnay engineering Détang engineering |
2016 - 2018 | 9 355 m2 above ground level and 4 651 m2 below ground level | |
Housing Europea | Construction of 53 flats on the blvd J. Charlotte, part of EUROPEA (multi-functional neighborhood, Heysel) (work in progress) |
EUROPEA Housing | JEAN-PAUL VIGUIER ET ASSOCIES, ART&BUILD, R2D2, ARCHI 2000, URBAN PLATFORM, AXENT, GUSTAFSON PORTER + BOWMAN, ARIES TPF ARCADIS |
2016 | 6 078 sqm above ground level and 51 sqm below ground level | |
Souverain S23View project | Competition: Urban planning and construction of 199 middle-income flats on an existing socle Blvd du Souverain in Auderghem | Cofinimo | Ney, Arcadis |
2016 | 23 850 sqm above ground level | n/c |
Canal WharfView project | Construction of 71 flats on the Canal de Willebroeck in Brussels (work in progress) | Canal Wharf sa pour AG Real Estate Development & Vooruitzicht | Stéphane Beel Architect, 51n4e Establis Istema Van Laere |
2014 - 2022 | 6.523 sqm above ground level, 4268 sqm below ground level | 8.480.000 (parking exc) |
City DoxView project | Construction of 93 flats, SIE (semi-industrial workshops), and retail boulevard... | Atenor (Immobilière de la petite île) | BST Matriciel |
2014 - 2019 | 20 644 m2 above ground level and 3 271 m2 below ground level | 20.000.000 |
Jardin d'unionView project | Housing, shops, daycare center and park on the avenue de la Deuxième Armée Britannique in Forest | s.a. Union | StuBeCo bvba BM Engineering |
2014 - 2019 | 17 228 m2 above ground level and 5 732 m2 below ground level | 20 200 000 |
Leopold ViewsView project | Conversion of an office tower into housing avenue de Genève in Evere | Matexi | SGI Consulting SGI Consulting |
2014 - 2019 | 21 361 m2 above ground level and 11 619 m2 below ground level | |
Mutualité | Construction of 55 flats rue de la Mutualité in Forest (work in progress) | Construction et Développement sa | Setesco FTI sa |
2014 | 7 623m2 above ground level and 3 220m2 below ground level | 10 150 000 |
RIVAView project | Construction of 139 flats, retail, public staircase and bicycle shelter in Brussels | Extensa | bST Ingenium Van Laere |
2014 - 2021 | 14 992 m2 above ground level and 5 360 m2 below ground level | 24.300.000 |
Canal DistrictView project | Construction of a housing complex, day-care centre, and park rue de la Senne in Brussels | Besix RED | Axcent ABCIS Van Wetter Concept Control Jacques Delens |
2013 - 2018 | 18 799 m2 above ground level and 3 100 m2 below ground level | 22 000 000 |
Dormont | Competition : 77 passive apartments rue Dormont in Berchem-Sainte-Agathe. | Fonds du logement | Setesco Daidalos Peutz - Détang engineering sprl |
2013 | 6 090 m2 above ground level and 1 860 m2 below ground level | 10 450 000 |
Grand-PréView project | Construction of apartments rue du Grand-Pré in Berchem-Sainte-Agathe. | Group Bouwen | Stubeco BM Engineering / |
2013 - 2019 | 3800 m2 above ground level and 1 715 m2 below ground level | / |
Haveskercke - BambouView project | Construction of 58 apartments avenue de Haveskercke and rue du Bambou in Forest | Matexi | Bureau Van Ransbeeck |
2013 - 2020 | 6100 m2 ground level and 2 660 m2 below ground level | 11 380 000 |
Namur 59View project | Heavy refurbishment of an office building with commercial ground floor and rooftop extension on the rue de Namur in Brussels | L.C.E.B.E. | Setesco Cenergie CIT BLATON |
2013 - 2018 | 4 352 m2 above ground level and 2 354 m2 below ground level | 6 500 000 |
Brussels GreenbizzView project | Environmental Incubator, Workshops and Offices rue Lefèvre in Brussels. | Citydev.brussels | Setesco - Ney WOW Istema - FTI - Cenergie CEI-de meyer |
2012 - 2016 | 5 000 m2 workshops - 2 500 m2 offices - 4 500 below ground level | 12 058 000 |
Cadixwijk | Competition: offices and groundfloor shops Cadixwijk in Antwerp. | Re-Vive - Vanharents | bob 361 - BLAF - MAAT |
2012 | 15 334 m2 | 19 935 000 |
Gembloux | Competition: Housing complex including ground floor retail facing the Gembloux train station. | Ville de Gembloux | / |
2012 | 10 058 m2 above ground level | 8 130 000 |
OresView project | Competition : nzeb offices avenue Mermoz in Gosselies. | ORES scrl | / |
2012 | 15 397 m2 | 20 016 000 |
Square de MeeûsView project | Refurbishment of an existing 1970's office building Square de Meeûs in Brussels | KanAm Grund | Setesco CES sa Valens - CFE sa |
2012 - 2015 | 37 769 m2 above ground level and 19 154 m2 below ground level | 57 450 000 |
Tervueren 168View project | Heavy refurbishment of an office building including new-build extension on the avenue de Tervueren in Woluwe. | L.C.E.B.E. | Bureau d'Etudes Matriche Cenergie CIT BLATON |
2012 - 2015 | 7 864 m2 above ground level and 5 736 m2 below ground level | 6 077 000 |
Crèche StationView project | Competition : Mixed-use Project including Daycare Centre, Childrens’ Center and Housing. | Commune de Saint-Josse-ten-Noode | Setesco Cenergie Jacques Delens |
2011 | ± 2 250 m2 | 2 925 000 |
Job HouseView project | Competition : Job-center and Offices rue du Collège in Ixelles | Commune d'Ixelles | Setesco Cenergie Jacques Delens |
2011 | ± 2 300 m2 | 2 990 000 |
Mutsaard | Competition: daycare centre and pre-school avenue Mutsaard in Neder-over-Heembeek. | Ville de Bruxelles | Setesco Cenergie Jacques Delens |
2011 | 1 800 m2 above ground level | 2 340 000 |
PicardView project | Competition : Ecosensitive home renting rue Picard in Molenbeek | Urbani sa | / / |
2011 - 2012 | ± 2 000 m2 | 2 600 000 |
Froissart - Belliard | Mixed-use housing/retail building on the rue de Froissard in Brussels. | Patrick Allan Conlan | VK engineering Arcadis Belgium |
2010 | 1 370 m2 above ground level and 276 m2 below ground level | 2 000 000 |
M Green | Urban planning scheme for a sustainable neighborhood on Tour & Taxi in Brussels. | Project T&T | / |
2010 | / | / |
Roosevelt | Mixed-use housing/office building avenue Franklin Roosevelt in Ixelles. | Het Fort sa | Bureau d’étude MATRICHE |
2010 | 904 m2 above ground level and 226 m2 below ground level | 1 250 000 |
ELIA Green Building "New Schaerbeek"View project | Extension of the Elia headquarters including Offices, a Photovoltaic Parking Canopy, a Cable Park and Landscaping on the quai Monnoyer in Schaarbeek. | Elia Asset | Arcadis Arcadis CFE Brabant |
2009 - 2013 | 10 000 m2 above ground level and 24 000 m2 cable park, parking and landscaping | 19 000 000 |
Alliance | Competition: Urban planning scheme for the Parc de l'Alliance in Braine-l'Alleud. | / | P. Vanderstraeten |
2008 | / | / |
Bourdon | Competition: 90 flats chaussée d'Alsemberg in Uccle. | SLRB | Setesco F.T.I. Egta et Flore |
2008 | 9 237 m2 above ground level and 1 964 m2 below ground level | 12 085 000 |
EmpereurView project | Construction of a mixed-use housing and office building boulevard de l’Empereur in Brussels. | FOREMOST IMMO sa | Setesco TEC-SPE sprl DENYS nv |
2008 - 2016 | 1 217 m2 above ground level and 227 m2 below ground level | 2 285 000 |
Louise | Conversion of an office building into housing on the avenue Louise in Brussels. | ELIMO sa | Setesco |
2008 | 4 479 m2 above ground level and 1 095 m2 below ground level | 4 280 000 |
Singapore | Competition: Singapour Embassy avenue Franklin Roosevelt in Brussels. | / | / |
2007 | 1 150 m2 above ground level and 610 m2 below ground level | 5 400 000 |
Trois rois | Construction of 30 flats avenue des Trois Rois in Uccle. | Williams&co | Bureau Van Ransbeek |
2007 - 2011 | 3 000 m2 above ground level and 1 000 m2 parking | 4 000 000 |
227 LoiView project | Heavy Refurbishment of a 1970s office building, including interior fit-out for the European Investment Bank rue de la Loi in Brussels. | Cofinimmo sa | TPF Engineering TPF Engineering Herpain Entreprises sa |
2006 - 2008 | 6 110 m2 above ground level and 3 983 m2 below ground level | 4 200 000 |
CrespelView project | Construction of 32 apartments and ground floor retail rue Crespel in Ixelles. | Immobel Group et CFE IMMO sa | B Group infra sa Tec-Spé sprl CFE et Louis de Waele |
2006 - 2010 | 4 067 m2 above ground level and 1 987 m2 below ground level | 6 350 000 |
Ernotte - IxellesView project | Urban planning and construction of 314 low-income homes, daycare center, and landscaping chaussée de Boitsfort in Ixelles. | SLRB | VK Engineering Axis-Engineering Cei-De Meyer et Jacques Delens |
2006 - 2011 | 34 389 m2 above ground level | 34 913 164 |
Woluwé 34 | Heavy refurbishment of an office building Boulevard de la Woluwe in Woluwe. | Cofinimmo sa | / |
2006 | 7 375 m2 above ground level | 3 180 000 |
Aeropolis IIView project | Construction of an office building and plaza avenue Britsiers in Schaerbeek. | Groep Arco - KWB - KAV – KAJ | Setesco Cenergie - ingenieursbureau Stockman Jacques Delens - Vanderstraeten |
2005 - 2010 | 7 388 m2 above ground level and 2 702 m2 below ground level | 13 500 000 |
GodecharlesView project | Construction of 66 apartments and ground floor retail rues Godecharle and Idalie in Ixelles. | Skyline Europe | Technics sprl Louis de Waele - Jacques Delens |
2005 - 2013 | 7 989 m2 above ground level and 3 031 m2 below ground level | 11 200 000 |
Gaucheret - Progrès | Construction of twin housing units rues Gaucheret and Progres in Schaerbeek. | Atenor / CPPM | B.E. Franz Dupont Amart sa |
2004 - 2007 | Gaucheret: 628 m2 above ground level, Progrès: 443 m2 above ground level | 1 250 000 |
Parking 58 | Competition: Transformation of a parking complex into housing/offices/retail in Brussels | Atenor | Ingénieurs Associés |
2004 | Housing: 24 361 m2, Offices: 7 866 m2, Carpark: 17 173 m2 | 53 057 000 |
Belmont CourtView project | Heavy Refurbishment and rooftop extension of the Ministry of Employment building rue Belliard in Brussels. | Axa Belgium sa | Setesco VK Engineering Herpain Entreprises sa |
2002 - 2006 | 32 000 m2 above ground level and 9 700 m2 below ground level | 30 000 000 |
Maisin CenterView project | Construction of an office building rue du Commerce in Brussels. | Centre Interdiocésain asbl | Setesco F.T.I. AMART sa |
2002 - 2004 | 1 591 m2 above ground level and 725 m2 below ground level | 3 160 000 |
BrusiliaView project | New-build housing completing the 1960s Brusilia Tower avenues Bertrand and Voltaire in Schaerbeek. | BPI sa | Setesco S.T.D. Consulting B.P.C. |
2001 - 2013 | 7 965 m2 above ground level and 3 841 m2 below ground level | 10 818 000 |
National TheaterView project | Construction of the Theatre National de Wallonie-Bruxelles boulevard Jacqmain in Brussels. | BBC for the Communauté Française de Belgique | L'atelier Gigogne sc, L'Escaut ELLYPS VK Engeenering Entreprise Louis de Waele |
2000 - 2004 | 12 000 m2 | 20 000 000 |